Self-Storage: Phased Construction
NORFOLK, VA
The design of this massive structure (4-story, 144,000 sf) encountered a number of complications during the development process. The poor soil conditions required substantial design consideration to determine the feasibility of the entire project. GMF+ worked with the civil engineer, structural engineer and building manufacturer to ensure a coordinated response for a large scale project, designed to be constructed in distinct phases to meet the investment strategy of the owner.